A comparative study of the benefits of applying target cost contracts between South Australia and Hong Kong

Daniel W.M. Chan, Patrick T.I. Lam, Joseph H.L. Chan, Tony Ma, Thomas Perkin

Research output: Contribution to journalReview articlepeer-review

8 Citations (Scopus)

Abstract

This article aims to identify and analyze the key benefits of adopting Guaranteed Maximum Price and Target Cost Contracts (GMP/TCC) over and above the traditional lump-sum contractual arrangement through an empirical questionnaire survey conducted in South Australia and compared with the findings in Hong Kong. The Mann-Whitney U Test indicated differences in perception between the two groups of respondents on the majority of the identified benefits. The study has provided an in-depth understanding of the perceived benefits of the GMP/TCC scheme, hence leading to a wider application of those alternative integrated procurement strategies in both regions for reference by the construction community at large.

Original languageEnglish
Pages (from-to)4-20
Number of pages17
JournalProject Management Journal
Volume43
Issue number2
DOIs
Publication statusPublished - Apr 2012

Keywords

  • Hong Kong
  • South Australia
  • benefits
  • guaranteed maximum price
  • target cost contracting