Abstract
This article aims to identify and analyze the key benefits of adopting Guaranteed Maximum Price and Target Cost Contracts (GMP/TCC) over and above the traditional lump-sum contractual arrangement through an empirical questionnaire survey conducted in South Australia and compared with the findings in Hong Kong. The Mann-Whitney U Test indicated differences in perception between the two groups of respondents on the majority of the identified benefits. The study has provided an in-depth understanding of the perceived benefits of the GMP/TCC scheme, hence leading to a wider application of those alternative integrated procurement strategies in both regions for reference by the construction community at large.
| Original language | English |
|---|---|
| Pages (from-to) | 4-20 |
| Number of pages | 17 |
| Journal | Project Management Journal |
| Volume | 43 |
| Issue number | 2 |
| DOIs | |
| Publication status | Published - Apr 2012 |
Keywords
- Hong Kong
- South Australia
- benefits
- guaranteed maximum price
- target cost contracting
Fingerprint
Dive into the research topics of 'A comparative study of the benefits of applying target cost contracts between South Australia and Hong Kong'. Together they form a unique fingerprint.Cite this
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver